|
|
||
|
CONSTRUCTION PROCESS
Footing Drilled Out and Column Placement
Assembling the Billboard Frame and Catwalks
Securing the Metal Panels to the Frame
Inside View of the Frame with the Metal Panels Fully Secured
Outside View of the Frame with the Metal Panels Fully Secured
Picture of Column and Concrete Footing
Column Footing Drying and the Billboad Frame & Panels are Prepared to Attach to the Column
Another View of the Frame and Panels Waiting to be Attached to the Column
The Crane being Attached to the Frame and Panels to Attach them to the Column
The Crane Lifting and Turning the Frames and Panels
The Crane Setting the Frame and Panels on the Column
The Frames and Panels Attached to the Column
Copyright 2006 - 2008 Smith Outdoor Advertising. All rights reserved. |